I don't know if i've asked this before, but does anyone know of any that exist?
I'm particularly looking for a layout of how the corridor stage pieces were put together, I've got enough floorplans of the Bridge and engineering to get by as it is, but I'd love to get a map of how the corridor pieces (transporter room, quarters and mess hall included) were added together.
hm in old game Star Trek: The fallen the player could roam thru the entire ship including corridors and section's connections - u could use the "Defiant" level as referene. No idea if there is more accurate map.
As you can see, Engineering was attached to some small utility room (I dontk now what it is) and the generic sickbay/mess hall/transporter room piece (the round bit cut off on the left).
the bridge area had some corridors and the bunk room.
Posts
Here:
Defiant Engineering layout: http://www.yourprops.com/Director-s-Plan-blueprint--Defiant-Engine-Room-original---screen-used-production-material-Star-Trek--Deep-Space-Nine--TV---1993--prop-43054.html
Defiant Engineering Corridor Layout: http://www.yourprops.com/Director-s-Plan-blueprint--Defiant-Engine-Room-Hall-original---screen-used-production-material-Star-Trek--Deep-Space-Nine--TV---1993--prop-42995.html
Defiant Bridge/Hallways/Quarters Layout: http://www.yourprops.com/Director-s-Plan-blueprint--Defiant-bridge-original---screen-used-production-material-Star-Trek--Deep-Space-Nine--TV---1993--prop-42983.html
As you can see, Engineering was attached to some small utility room (I dontk now what it is) and the generic sickbay/mess hall/transporter room piece (the round bit cut off on the left).
the bridge area had some corridors and the bunk room.
YAY!
Current Projects:
Ambassador Class